Construction Performance Guidelines
SEARCH GPG CE
About the Guidelines
These helpful guidelines outline work and material deficiencies in new homes and residential condominium units covered under the statutory warranty [...]
Article Number
2.21
Condition
WEEP HOLES MISSING IN MASONRY EXTERIOR CAVITY WALL OR VENEER SYSTEM
Acceptable Performance/Condition
Weep holes in masonry veneer shall be installed to achieve the performance required by the Ontario Building Code.
Warranty
One --Year- Work and Materials. One – Year – Ontario Building Code Violation
Action
Masonry veneer not meeting the acceptable condition shall be repaired.
Remarks
The Ontario Building Code references CSA A371 “Masonry Construction for Buildings”; section 12 discusses requirement for weep holes.