Resources
SEARCH PUBLICATIONS
Recent
BB19R - Condominium Projects Design and Field Review Reporting (2017)
January 1, 2017Effective for all projects with a construction start date on or after January 1, 2017. Construction is considered to have started when excavation begins. This bulletin sets out the requirements for reports and information that must be provided to Tarion by Field Review Consultants and the vendor/builders of Designated Condominiums enrolled under the Ontario New Home Warranties Plan Act. SCROLL DOWN TO VIEW ALL RELATED FORMS.
Module 1 - FRC Bulletin 19R Qualification Status
Module 1A - FRC Application for Bulletin 19R Qualification Status
Module 2A - Scope of Work Proposal
Module 2A – Scope of Work Proposal (Updated September 1, 2020)
Module 3 - Scope of Work - Notional Building Guidelines for Level of Effort
Module 3A - Scope of Work - Notional Building Guidelines for Level of Effort
Module 4 - Appendix - Design Review
Module 4 - Appendix - What a Deficiency Is and When to Report One
Module 4 - Field Review Consultant Reporting Requirements
Module 4A - Appendix - Design Certificate
Module 4C - Milestone Report - Deficiency Summary